Further information on QM of survey and clearance operations
IMAS
- IMAS 04.10 Glossary
- IMAS 07.30 Accreditation of demining organizations and operations
- IMAS 07.40 Monitoring of demining organizations
- IMAS 07.41 Monitoring of MRE
- IMAS 07.42 Monitoring of stockpile destruction
- IMAS 09.20 Guidelines for Post Clearance Sampling
- IMAS 09.42 Operational testing of mine detection dogs and handlers
These documents can be found on the IMAS page of the International Mine Action Standards website
CEN Workshop Agreement
- CWA 14747 Humanitarian Mine Action - Test and evaluation – Metal Detectors
- CWA 15044 Test and evaluation of demining machines
- Part 1: The effect of soil condition on measurements of ground penetration depth and machine performance
- Part 2: Interpretation of ground penetration depth measurements
- Part 3: Measuring soil compaction and soil moisture content of areas for testing of mechanical demining equipment
- Part 4: Statistical methods used to calculate demining machine performance, performance confidence intervals and performance differences (under review)
- CWA 15833 Humanitarian mine action - Quality management – Quality assurance (QA) and quality control (QC) for mechanical demining
These documents can be found on the CWA page of the International Mine Action Standards website